Projects

The most important projects completed by the team of “Baugrund Institut Knerim” Ltd. Are:

  • Regional landfill – Pazardzhik, Cell I and supporting infrastructure, Detailed Design, 2013-2014;
  • Research and HELP-modeling of the water retention of the top liner of the Waste Disposal Fasility from “AES Thermal Power Plant Maritza East 1” by v. Obruchishte, 2014;
  • Project for the closure and recultivation of the old city landfill – Lovech, Detailed Design, 2013;
  • Actualization of the project “Regional landfill for non-hazardous waste of the Municipalities Lovech, Letnitsa and Ugurchin”, 2014; Preliminary design of the elements of the Regional Waste Management System for Pazardzhik region – Regional Center for Waste Management – Aleko Konstantinovo and Transfer station – Rakitovo, incl. the closure and recultivation of the old municipal landfill of the municipality of Pazardzhik of site Aleko Konstantinovo, 2012-2014;
  • Feasibility research and detailed design for the closure and recultivation of the landfill of Municipality Slivo pole, 2011;
  • Research and Preliminary design for the facilities of the Regional Center for treatment of non-hazardous waste – Dupnitsa, 2012-2013;
  • Integrated system of facilities for treatment of the non-hazardous waste in Razgrad region, detailed design, 2010-2011;
  • Facilities for pre-treatment of industrial and hazardous waste from the activities of Lukoil Neftochim Burgas AD, for the purpose of further disposal, 2005-2006;
  • Regional landfill for non-hazardous waste of the Municipalities Lovech, Letnitsa and Ugarchin, detailed design, 2003;
  • Reconstruction and modernization of the landfill of Gabrovo Municipality with the aim of transforming it into a Regional landfill for the Municipalities Gabrovo and Tryavna, 2005-2006;
  • Project for the closure and recultivation of the old landfill of Tryavna Municipality, 2009;
  • Wastewater treatment station for the waste water to the Regional landfill – Razgrad, 2011;
  • Detailed design for the construction of a Regional landfill for non-hazardous waste – Razgrad, Stage I, 2003;
  • Detailed design for the closure and recultivation for the landfill for municipal waste of Letnitsa Municipality, 2008;
  • Extension of the existing landfill of the municipality Dobrich, Detailed design, 1999;
  • Landfill for asbestos waste of TPP Varna, preliminary design, 2006;
  • Landfill for hazardous waste, landfill for industrial waste and landfill for construction waste “Swiloza” AD, 2006;
  • Feasibility studies for closure and recultivarion of old landfills of the municipalities of Kardzhali, Krumovgrad, Momchilgrad, Kirkovo, Chernoochene, Djebel, Ivaylovgrad, Ardino, 2001-2002;
  • Feasibility studies for closure and recultivarion of old landfills of the municipalities of Kyustendil, Boboshtevo, Nevestino, Bobov Dol, Dupnitsa, Kocherinovo, Simitli, Sapareva Banya, Blagoevgrad, as a joint development of experts from the team with main contractor “Club Economics 2000 “, 2004;
  • New landfill for non-hazardous waste of Svoge Municipality, Preliminary design, 1998-1999;
  • Landfill for non-hazardous waste – Karlovo Municipality, 1998;

 

Important clients and projects of “Ground Mechanics” Laboratory

Control of the embankments during the construction of the left and right dike of Lesnovska river, assignor “Irrigation Systems” EAD;
Field and laboratory tests for the extension of airports Burgas and Varna;
Field and laboratory tests of the waste disposal facility of AES Maritza East/ I EOOD, fencing dikes, mineral capping layer,
Laboratory testing of a mineral liner of the Regional landfill for non-hazardous waste – Lukovit;
Intermodal Terminal – Port of Varna, laboratory tests;
Engineering-geological research, incl. laboratory test of the sites for the construction of an integrated system of facilities for treatment of non-hazardous waste from Razgrad Region;
Field and laboratory control during the construction of the landfill for non-hazardous waste – Dobrich;
Field and laboratory control during the construction of the regional landfill for non-hazardous waste – Lovech, Letnitsa and Ugurchin;
Field and laboratory control during the construction of the regional landfill for non-hazardous waste – Razgrad, stage I;
Tests for the construction of 300 units of wind turbines in Northeastern Bulgaria;
Research on the influence of bentonite as a soil improver of construction soils with specific application in the construction of mineral liner at landfills, assignor “Bentonite” EAD, Kardzhali;
Quality control in the execution of mineral liners in the construction of landfills in Germany, as a subcontractor of “Das Baugrund Institut” Ltd., Kassel, Germany for the following projects:
 Landfill “Am Bastwald”, “Kirschenplantage”, “Polsche Heide”
 Landfill for hazardous waste “Lüthorst” (assignor VKK Marburg)
 Landfill “Friedland – Dayderode” (County Göttingen)
 Landfill for hazardous waste “Lüthorst”, landfill for hazardous waste “Ascherberg”
 Landfill for minicipal waste “Kyonigsbyul/Köningsbül”
 Landfill for waste water sediments “Lenglern”
 Landfill for municipal waste “Kirshenplantazhe”
 Landfill for technological waste “Vabern – Utershauzen”, contractor “KIMM” AG DLGM
 Landfill for municipal waste “Operman – Süd”
 Landfill for municipal waste “Schtadtoldendorf”
 Landfill for municipal waste “Lokum” (County Ninburg)
 Landfill for municipal waste “Blankenhagen”
 Landfill REA on a site of a former open pit mine, operated by “Preussen Elektra”)
 Landfill “Baunatal” – for technological waste of the Volkswagen -factories